  Den Helder gas treatment plant is a key processing facility in the North Western part of the Netherlands. It processes both HiCal and LoCal gas at separate plants at the site. In addition, there is also a section which processes the gas from the Nogat system.
    The plant is operated by NAM. The facility was built between 1974 and 1975 and went into operation in 1976, when first gas (HiCal) entered the system via the K13-A platform entry point and the WGT. The facility is the receiving point for gas evacuated via the HiCal WGT Pipeline and the JDA LoCal pipeline.
    The 36-inch WGT Pipeline is a HiCal gas gathering system, originally laid to evacuate gas from the NAM-operated JDA fields and Pennzoil operated fields to the west.


 
















 